Installation of Polystyrene Insulated Facade in Shahr-e-Kord

اجرای نمای عایق پلی استایرن در شهرکرد
Installation of Polystyrene Insulated Facade in Shahr-e-KordProject Location: Shahr-e-Kord, Chaharmahal and BakhtiariExecution Time: March 2024 Execution Time: Esfand 1402 (February-March 2024) Installation time: One working week (the installation process in large projects depends on the progress of the project) The installation of the polystyrene insulated facade in Shahr-e-Kord was carried out using Behina Nama tools.In this project, the facade of a 2-story residential building in Shahr-e-Kord was covered with our tools. Panel tools were used for smooth surfaces, and simple tools were applied around the windows. Due to the cold and snow in winter, the best option to prevent energy loss is to use our tools. Our tools are resistant to freezing on cold winter days. It has passed its test in wet areas.

Installation of Polystyrene Insulated Facade in Shahr-e-Kord

Project Location: Shahr-e-Kord, Chaharmahal and Bakhtiari

Execution Time: Esfand 1402 (February-March 2024)

Installation time: One working week (the installation process in large projects depends on the progress of the project)

The installation of a polystyrene insulated facade in Shahr-e-Kord was carried out using Behina Nama tools.In this project, the facade of a 2-story residential building in Shahr-e-Kord was covered with our tools. Panel tools were used for smooth surfaces, and simple tools were applied around the windows.0

Due to the cold and snow in winter, the best option to prevent energy loss is to use our tools.

Our tools are resistant to freezing on cold winter days. It has passed its test in wet areas.

Due to the high speed of production and installation of tools, this material is used.

Bahina Nama tools are the best option for renovating and implementing Nama. After installation, it is very beautiful and not comparable to other Nama tools.

If you have little time, the facade of your building needs renovation, you are looking for up-to-date and prefabricated materials, the best option for the facade is Bahina Nama tools.

The climate of Shahr-e-Kord is moderate and cold, with mild summers and cold, snowy winters. Maintaining a comfortable indoor temperature requires significant energy consumption, making energy loss a critical issue. However, temperature fluctuations have no effect on Behina Nama facades.

As a result of radiation and air pollution, it does not change color and wear out over time. Energy loss is very important. The use of our tools prevents about 60% of energy waste. Fuel energy consumption is reduced.

These tools are prefabricated in the factory and are installed with high speed and precision without work rabbets and chassis.

These facade products have a high resistance against intense sunlight. Due to sound insulation and heat and cold insulation, it is the best option for the facade and covering of the building.

Installation of Polystyrene Insulated Facade in Shahr-e-Kord :

  • Smooth Surface PL_001
  • Window Frame: WT_015

Installation of Polystyrene Insulated Facade in Shahr-e-Kord Installation of Polystyrene Insulated Facade in Shahr-e-Kord Installation of Polystyrene Insulated Facade in Shahr-e-Kord Installation of Polystyrene Insulated Facade in Shahr-e-Kord Installation of Polystyrene Insulated Facade in Shahr-e-Kord Installation of Polystyrene Insulated Facade in Shahr-e-Kord

اشتراک گذاری

Leave a Reply

Your email address will not be published. Required fields are marked *

نمونه کارهای مرتبط

تماس با ما

با ما تماس بگیرید یا شماره تلفن خود را بگذارید تا کارشناسان ما با شما تماس بگیرند

24/7

02691002879